Bearers bolted onto the steel posts.
The first joist is now on the bearers.
Joists going in with blocking between them and on the ends.
The structa-flooring is now going on. This is glued and screwed down to the joists. 

Putting the glue on for the flooring.
No comments:
Post a Comment